Great Western Railway – Exeter St David’s Depot
FirstClass were awarded the contract to supply a new Depot Protection System. We have developed a fully flexible and adaptable Depot Protection System (DPS) that can be integrated into any rail depot.
FirstClass were awarded the contract to supply a new Depot Protection System. We have developed a fully flexible and adaptable Depot Protection System (DPS) that can be integrated into any rail depot.
The Penzance maintenance depot was a phased upgrade project and the Depot Protection System is performing excellently and with the knowledge that our product is contributing to the safe running of the depot.
The LNER /HITACHI MAINTENANCE DEPOT remained operational throughout the upgrade work and our Depot Protection System is performing brilliantly and with the knowledge that our product is contributing to the safe running of the depot.